Pay in 4 interest-free payments of $9.99 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 9 - Aug 14
Pay in 4 interest-free payments of $9.99 Learn more
Ships within 48 hours · Estimated delivery Aug 9 - Aug 14
This also makes it the ideal basis for PC-based automation
Molded in multiple colors and clear plastic
8 x K20-401 (Pre-Cast Concrete Double Elevated Track 248mm Straight)
Separate windows
2 flat wagons for carrying rail sections
R40154 Mk4 Open First BR Coach H 11212 Intercity Swallow option-set-006 This also makes it theBuilt at Metro Cammell's Washwood Heath factory, 314 Mk4 coaches were produced between 1989 and 1992. They were built specifically for use on the newly electrified East Coast Main Line, along with hopes that a second order for the West Coast Main Line would be placed at a later date, although this second order never transpired. Mk4 coaches featured many improvements over the Mk3s such as push button operated plug type doors, fully sealed gangways and
US$ 120.00
US$ 140.00
US$ 110.00
US$ 139.00
US$ 145.00
US$ 310.00