Pay in 4 interest-free payments of $11.24 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 9 - Aug 14
Pay in 4 interest-free payments of $11.24 Learn more
Ships within 48 hours · Estimated delivery Aug 9 - Aug 14
• DC control switches to be accessible via lift-off roof panel
Toby is based on a J70 tram engine from the Great Eastern Railway (GER Class C53)
The Rolling Underframe kit (Ref 546A) can be added to transform this unit into a movable crane
entire trains could be serviced and on the move in minutes
while the surrounding pit ring is styled in concrete grey for a convincing depot appearance straight out of the box
4P-020-511 GWR Toplight Mainline City BR Maroon All Second 3911 Set 6 option-set-w-coach-1 • DC control switches toThe first order for these coaches was placed in 1915 but, due to the First World War, they were not built until 1920. The second batch was completed in 1921. Six sets of coaches were produced with each set comprising six coaches. The coaches were close coupled and constructed with a steel body rather than the traditional wooden panelling. Due to the restrictive loading gauge of the London Underground tunnels, the carriages are 7 inches lower than
US$ 43.70
US$ 370.00
US$ 59.80
US$ 580.00
US$ 935.00
US$ 218.00