Pay in 4 interest-free payments of $11.24 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 8 - Aug 13
Pay in 4 interest-free payments of $11.24 Learn more
Ships within 48 hours · Estimated delivery Aug 8 - Aug 13
The floorboards of the coach are amongst the many intricately detailed features
Directional headlights and tail lights on both the front and rear of the locomotive
Compressor with power supply
Richly detailed with an eye toward realism and romance
the type was given the designation AL6 (meaning the sixth design of AC Locomotive)
4P-020-522 GWR Toplight Mainline City BR Maroon Composite 7912 Set 6 option-set-105 The floorboards of the coachThe first order for these coaches was placed in 1915 but, due to the First World War, they were not built until 1920. The second batch was completed in 1921. Six sets of coaches were produced with each set comprising six coaches. The coaches were close coupled and constructed with a steel body rather than the traditional wooden panelling. Due to the restrictive loading gauge of the London Underground tunnels, the carriages are 7 inches lower than
US$ 72.00
US$ 78.00
US$ 128.00
US$ 142.00
US$ 194.00
US$ 48.00
US$ 109.00
US$ 2500.00